Outlet works

Results: 52



#Item
31ARROWROCK DAM OUTLET WORKS REHABILITATION PHYSICAL MODELING Joe Kubitschek, M.S., Hydraulic Engineer, D-8560, ([removed]Warren Frizell, M.S., Research Hydraulic Engineer, D-8560, ([removed] • •

ARROWROCK DAM OUTLET WORKS REHABILITATION PHYSICAL MODELING Joe Kubitschek, M.S., Hydraulic Engineer, D-8560, ([removed]Warren Frizell, M.S., Research Hydraulic Engineer, D-8560, ([removed] • •

Add to Reading List

Source URL: www.usbr.gov

- Date: 2012-09-08 01:25:10
    32Hydraulic Model Studies of Aeration Enhancements at the Folsom Dam Outlet Works: Reducing Cavitation Damage Potential by K. Warren Frizell Research Hydraulic Engineer Water Resources Research Laboratory

    Hydraulic Model Studies of Aeration Enhancements at the Folsom Dam Outlet Works: Reducing Cavitation Damage Potential by K. Warren Frizell Research Hydraulic Engineer Water Resources Research Laboratory

    Add to Reading List

    Source URL: www.usbr.gov

    Language: English - Date: 2012-09-07 17:57:25
    33D:�ason�roVisionpaperrev0304.wpd

    D:asonroVisionpaperrev0304.wpd

    Add to Reading List

    Source URL: www.usbr.gov

    Language: English - Date: 2012-12-31 16:08:59
    34Hydraulic Laboratory Report HL[removed]Flow Deflectors for Mitigation of Stilling Basin Abrasion Damage  U.S. Department of the Interior

    Hydraulic Laboratory Report HL[removed]Flow Deflectors for Mitigation of Stilling Basin Abrasion Damage U.S. Department of the Interior

    Add to Reading List

    Source URL: www.usbr.gov

    Language: English - Date: 2012-09-07 18:44:35
    35Microsoft Word - CCTV Brochure-Jan11.doc

    Microsoft Word - CCTV Brochure-Jan11.doc

    Add to Reading List

    Source URL: www.usbr.gov

    Language: English - Date: 2012-09-11 17:55:26
    36

    PDF Document

    Add to Reading List

    Source URL: www.usbr.gov

    Language: English - Date: 2012-09-07 17:39:10
    37Water Control Structures Selected Design Guidelines - Section 14

    Water Control Structures Selected Design Guidelines - Section 14

    Add to Reading List

    Source URL: www.transportation.alberta.ca

    Language: English - Date: 2008-06-12 23:06:20
    38Arrowrock Dam Outlet Works Rehabilitation Endangered Species Monitoring and Mitigation Program[removed]Monthly Summary Reports for Radio Telemetry Investigations for Bull Trout.

    Arrowrock Dam Outlet Works Rehabilitation Endangered Species Monitoring and Mitigation Program[removed]Monthly Summary Reports for Radio Telemetry Investigations for Bull Trout.

    Add to Reading List

    Source URL: www.usbr.gov

    Language: English - Date: 2014-08-21 11:15:59
    39Emergency Spillway Crest Primary Spillway Berm

    Emergency Spillway Crest Primary Spillway Berm

    Add to Reading List

    Source URL: www.in.gov

    Language: English - Date: 2014-08-07 00:19:35
    40WD-DB[removed]Best Management Practices for the Maintenance and Operation of Dams

    WD-DB[removed]Best Management Practices for the Maintenance and Operation of Dams

    Add to Reading List

    Source URL: des.nh.gov

    Language: English - Date: 2013-03-10 05:00:00